
4 Kingdom Street, London
4 Kingdom Street, the first building developed by British Land at Paddington Central, is a landmark nine-storey building encompassing a number of wellbeing design features…
Off-site manufacture is a preferred solution for projects where volumetric modules form a large part of the overall construction or where clients require full-size mock-ups for consideration prior to order.
Just 30-minutes by tube from Central London, Washroom’s extensive manufacturing facility is ideally placed to enable clients to visit, with minimal downtime.
Full size mock-ups can be created incorporating the most exacting details to ensure that the final design and manufacture meets fully with the specifiers intended aesthetic, prior to factory manufacture.
In addition, with programmes becoming more demanding necessitating ever increasing co-ordination of trades in order to meet deadlines, Washroom has invested in additional factory space to enable the manufacture and build of entire washroom units off-site.
Careful on-site surveying by experienced site staff, programming to co-ordinate with other trades and the ability to design and build away from site ensures that build quality is undertaken to the most exacting standards.
The washroom components are subsequently de-constructed, transported to site and assembled in a fraction of the time associated with conventional build.
In addition to enhancing quality and programme, off-site construction offers the opportunity to reduce on-site waste by up to 90% compared to traditional methods of construction.
A combination of 3D printing to ensure bespoke detailing such as face plates and ironmongery fully meet expectations, through to the production of off-site mock-ups for client inspection prior to manufacture and subsequently off-site assembly, Washroom is dedicated to providing the most comprehensive service available to the specifier.
Receive our newsletter, plus all the latest project and product info from Washroom Washroom.