Proud to work in partnership with ISG

1st February 2017

We’ve worked closely with international construction services company, ISG, on two prestigious projects this year and we’re about to start work on third high profile project with the team in Bristol.

Honda Building at Heathrow Approach in Slough

Working alongside ISG on the extensive refurbishment project for the iconic old Honda Building at Heathrow Approach in Slough, we installed new male and female washrooms in both East and West cores of the building as well as a new staff shower and changing area in the basement.

Our full height, flush facia Alto toilet cubicles, with unique rebated edges which offer a virtually seamless façade, were specified with a black walnut straight grain real wood veneer finish for the washrooms on all five floors of the building. Our Concerto integrated duct panelling system were finished in the same real wood veneer finish and the crisp white Zodiac stone vanities complete the high specification design. The staff shower area also features the same white Zodiac stone vanities along with our bespoke locker system, again in white to create a contemporary space.

The Bower in Stockley Park

Reception desk at The Bower in Stockley Park

At The Bower in Stockley Park, we designed, manufactured and installed a striking Corian feature reception desk, to complement the angular lines of the staircases in the building’s central atrium.

We also installed new washrooms featuring our full height Alto toilet cubicles, finished in a real wood walnut veneer as well as our Concerto integrated duct panelling system, which was faced with toughened glass. We also designed and installed bespoke Corian trough style vanity units with an integral handbag shelf together with our new hinged mirror system, Tego, which is designed to house essential washroom consumables. Our popular Forza lockers were specified in the staff shower and changing area.

Bespoke Corian trough style vanity units - The Bower

Rounding up the trio of ISG projects, we’re now about to start work with the team on a large-scale office refurbishment in one of the tallest buildings in Bristol. Over the next nine months we’ll be installing new washrooms, creating a new cycle centre in the basement and installing two Corian reception desks in the main entrance, so watch this space for more updates!